The school hasn’t been maintained for years and so, it required maintenance immediately. In 2013 the school was rehabilitated from a natural disaster. As for this year, a roof was repaired, a drain pipe, doors and windows, façade, outer stairs were fixed. The maintenance process is continuing and in a new academic year students will have a renewed building and that will have a good influence on a studying process.
In region of Guria building/rehabilitation of 28 public schools is planned in 2015. The budget is million two hundred thousand GEL. New schools will be built in villages of Zota and Chanieti. Medical cabinets were equipped at 7 schools, and this process is continuing at the rst of the schools.